LIVE
Updated 24 Nov, 12:51 am IST
Tuesday, 24 November 2026

Home / Business

Business

Ashoka Buildcon Jaipur Metro Bid: JV L1 for ₹2,758 Crore; NHAI Order

Ashoka Buildcon Jaipur Metro bid: its JV with SAM India is L1 for ₹2,758.31 crore of Phase-II work, and NHAI awarded a ₹1,465 crore expressway job.

Ashoka Buildcon Jaipur Metro bid - elevated metro station and viaduct in India

Ashoka Buildcon’s joint venture with SAM India has emerged as the lowest bidder for two Jaipur Metro Phase-II packages worth ₹2,758.31 crore, the company said in an exchange filing on 20 November. The Ashoka Buildcon Jaipur Metro bid came on the same day the company received a ₹1,465 crore letter of acceptance from the National Highways Authority of India (NHAI).

Taken together, the metro bids and the highway award add up to infrastructure work worth over ₹4,200 crore, CNBC-TV18 reported. The stock featured on several brokerages’ lists of stocks to watch for Monday’s trading session.

What the Ashoka Buildcon Jaipur Metro packages cover

The bids were submitted to Rajasthan Metro Rail Corporation Ltd (RMRCL), with Ashoka Buildcon as the lead member of the joint venture. Package 3 is quoted at ₹1,130.31 crore and covers an elevated viaduct and 12 elevated stations, including architectural finishing.

Package 4, the larger of the two at ₹1,628 crore, includes an elevated viaduct and 11 elevated stations. It also covers modification of part of the operational Phase-I corridor and construction of the Khasa Kothi Phase-I station.

Both prices include GST and are on a lump-sum design-and-construction basis. Each package carries a 36-month execution period followed by a 12-month defect-liability period, according to the filing.

Investors should note that L1 status is a bid ranking, not a signed contract. The filing does not mention a letter of award, and it does not disclose how the work will be split between Ashoka Buildcon and SAM India.

NHAI contract on the Vadodara-Mumbai Expressway

The NHAI order is on firmer ground. Ashoka Buildcon received a letter of acceptance for Package VIII of the Vadodara-Mumbai Expressway, which covers balance work on an eight-lane, access-controlled stretch between Jujuwa and Gandeva in Gujarat.

The NHAI contract is priced at ₹1,465 crore excluding GST and runs from Km 154.6 to Km 190. It must be executed within 18 months and carries a 10-year defect-liability period. The company had disclosed on 17 November that it was the lowest bidder for the project.

Why the order wins matter for investors

The new orders arrive at a difficult time for the company. Ashoka Buildcon reported a consolidated net loss of ₹118.96 crore for the September 2026 quarter, against a profit a year earlier, while consolidated total income fell 15% year-on-year to ₹1,609.21 crore.

Management has guided for modest revenue growth in FY27, citing slower awarding of domestic road projects and execution challenges. The company’s order book stood at ₹15,964 crore as of 30 September 2026.

Fresh wins from NHAI and a state metro agency help on two fronts. They add to revenue visibility, and the metro packages fit management’s stated plan to pursue non-road work while highway awarding stays slow.

The company has guided for a standalone EBITDA margin of 9% to 9.5% in the second half of FY27. It is also targeting standalone debt of ₹600 crore to ₹700 crore by March 2027, so investors will track how much working capital the new projects need.

For the wider sector, the Jaipur packages show that urban transit remains a source of large EPC tenders even as road tendering cools. Larger peers have also reported strong order inflows, as seen in our coverage of L&T’s record Q2 order inflow. Indian equities have also had support from foreign investors, as our report on record FII inflows shows.

What happens next

The key trigger for the Ashoka Buildcon Jaipur Metro bid is whether RMRCL converts the L1 ranking into formal awards for Package 3 and Package 4. The company has not given a timeline for that step, and the final order value attributable to Ashoka Buildcon will depend on the joint venture’s internal split.

On the expressway, the company has not disclosed the date from which the 18-month execution period will run. Investors will watch the December-quarter results for progress on order inflow, margins and debt reduction. For more company and market updates, visit our business news section.